For superintendents and foremen on small US crews
Type today's jobsite notes. Get a daily report you can sign.
A construction daily report is the official record of the day: who was on site, what got built, the weather, and any delays. Superintendents file one so owners, inspectors, and insurers have a paper trail.
Type three sentences. Get a Word or PDF with official National Weather Service weather already filled in. Your first 3 reports are free.
3 free drafts, no sign-up. Free drafts carry a DRAFT watermark.
Upgrade to Fill Pro for clean drafts
Fill Pro gives your whole company up to 300 unwatermarked daily reports and JHAs a month for $15/mo, with a 14-day refund. It adds automatic National Weather Service data and saved jobsites.
The $49 pack is 25 printable Word, Excel, and PDF forms, with no AI fill.
Already have Fill Pro? Enter your license key
Just need a blank form? Download the daily report template
How the report gets written
You already know what happened on site. The form is the part that takes time.
-
Type what happened
Three sentences is enough: who was there, what got built, and anything that delayed the work.
-
We fill the sheet
The draft is laid out like a printed daily report, with official high, low, and rainfall from the nearest National Weather Service station for that date.
-
You check it and sign
Download Word or PDF. Anything we could not read from your notes is flagged in the margin before you sign.
What goes on a daily report
Owners, inspectors, and insurance companies ask for the same record of the day. This is the information they expect to see.
-
Crew on site
Your people and each subcontractor, with headcount. This is often the first thing a project manager checks.
-
Work completed
What got built, where, and any quantities you mentioned: footings poured, squares of roof, feet of trench.
-
Official weather
High, low, and rainfall from the nearest NWS station, plus anything you reported on site. Useful when a delay claim later comes up.
-
Delays and inspections
Rain stoppages, late trucks, and passed or failed inspections, with times when you gave them.
25 printable Word, Excel, and PDF templates ($49 once)
10 daily and claim forms, 12 OSHA 1926 JHAs, 3 inspection and training records, and 2 bonus sign-in sheets in Word, Excel, and PDF. Every template is free to preview. eCFR citations last checked Nov 26, 2026.
Priced per company, not per person
Both options include a 14-day refund. Checkout is through Stripe; sold by Freeman Labs LLC.
If you still fill forms by hand
Field Pack
$49 one time
- All 25 editable templates (+ 2 bonus sign-in sheets) in Word, Excel, and PDF
- 12 JHAs with OSHA 1926 citations
- Free updates to the current pack files
If you file a report every day
Recommended for daily reports
Fill Pro
$15 a month, whole company
- Filled reports and JHAs from your notes (up to 300 a month), no watermark
- Saved jobsites and automatic NWS weather
- A running weather and delay log (CSV) for claims
Or $129 a year, with the Field Pack included.
Questions
What is a construction daily report?
It is the official record of the day on a jobsite: who was there, what got built, the weather, inspections, deliveries, and any delays. There is a longer walkthrough in What is a daily construction report?
Is this OSHA compliance advice?
No. JHAs are drafts for federal OSHA 29 CFR Part 1926 that a competent person must review before site use. State-plan states such as CA, WA and OR add their own rules.
What happens after the 3 free drafts?
You can keep downloading the blank templates for free. To keep generating filled reports without the watermark, use Fill Pro.
Who runs FieldPack?
FieldPack is published by Kristian Freeman of Freeman Labs LLC in Austin, Texas. Questions or refunds: support@foremanpack.com.
Who runs this. I'm Kristian Freeman, a software engineer in Austin, Texas. I run Freeman Labs LLC and publish FieldPack so small crews can finish a daily report fast. You do not have to hunt down the weather or start from a blank page. Questions: support@foremanpack.com.