OSHA 29 CFR 1926 Subpart P · Checked Nov 26, 2026

Trenching & Excavation JHA Template (OSHA 1926 Subpart P)

Comprehensive excavation JHA covering 811 utility locates, daily competent-person inspections (including after rain), cave-in protection at 5 ft+, 2-ft spoil setbacks, and ladders within 25 ft.

Draft a JHA for Your Task (Free)
Download Free Blank PDF

Includes Word (.docx), Excel (.xlsx), and PDF · Need just this JHA?

Draft for competent-person review: Walk the jobsite, adjust controls for actual conditions, and sign before work starts. Covers US federal 29 CFR Part 1926 only (state-plan states like CA, WA, and OR enforce extra rules). Not an OSHA compliance guarantee.

Steps, hazards & controls

Work Step Hazard Control 29 CFR 1926 Reference
Locate underground utilities and mark excavation zone Striking buried gas, electric, fiber, or water lines Obtain 811 utility locates, verify mark-outs, and hand-dig/pothole within tolerance zone before mechanical excavation
Control level: engineering
Excavate trench, manage spoil piles, and install protective system Trench wall cave-in or spoil/equipment rolling into trench Install sloping, benching, shoring, or a trench box/shield for all excavations 5 ft or deeper (or shallower if unstable soil)
Control level: engineering
Excavate trench, manage spoil piles, and install protective system Trench wall cave-in or spoil/equipment rolling into trench Keep manufacturer tabulated data on site for trench boxes/shoring; require RPE design for excavations > 20 ft
Control level: administrative
Excavate trench, manage spoil piles, and install protective system Trench wall cave-in or spoil/equipment rolling into trench Place all excavated spoil piles, pipes, and tools at least 2 ft back from trench edge
Control level: engineering
Provide safe egress and conduct daily competent-person inspections Workers trapped in trench during sudden wall sloughing or post-rain instability Place access ladder/ramp in trenches 4 ft or deeper so lateral travel never exceeds 25 ft
Control level: engineering
Provide safe egress and conduct daily competent-person inspections Workers trapped in trench during sudden wall sloughing or post-rain instability Competent person inspects soil, fissures, water, and shoring before shift, throughout day, and after any rainstorm
Control level: administrative

Competent person & paperwork

Competent person required: Yes

Daily inspections of excavations, adjacent areas, and protective systems by a competent person are mandatory prior to start of work and after every rainstorm (1926.651(k)(1)).

  • Competent-person designation & Daily Excavation Inspection Log (1926.651(k)(1))
  • Manufacturer tabulated data on site for trench boxes (1926.652(c)(2)(iii))

Baseline PPE

  • Hardhat
  • High-visibility vest (Class 2/3)
  • Steel-toe boots
  • ANSI Z87.1 safety glasses
  • Work gloves
Related OSHA 1926 guides: 1926.651 · 1926.652 · 1926.602