Subpart P — Excavations

Paperwork for 29 CFR 1926.651: Specific excavation requirements.

Plain-English summary (not the official rule): Covers underground utility locates (811) prior to digging, safe egress (ladder/ramp within 25 ft in trenches 4+ ft deep), spoil piles kept at least 2 ft back from edges, water accumulation controls, hazardous atmosphere testing, and daily competent-person inspections.
Competent person check: Daily inspections of excavations, adjacent areas, and protective systems MUST be made by a competent person prior to start of work, as needed throughout the shift, and after every rainstorm or hazard-increasing event (1926.651(k)(1)).

Written records & field paperwork

CitationDocument / RecordWhat to include
29 CFR 1926.651(b)(1) 811 / underground utility locate ticket number & mark-out confirmation Record locate ticket number, utility responses, and potholing verification prior to mechanical excavation.
29 CFR 1926.651(k)(1) Daily Competent-Person Excavation Inspection Log Document soil classification, protective system check, water/fissure signs, spoil setback, and post-rain re-inspection.

Key paragraphs referenced

ParagraphSummary
1926.651(b)(1) Estimated location of utility installations (sewer, phone, fuel, electric, water) must be determined prior to opening an excavation.
1926.651(c)(2) A stairway, ladder, ramp, or other safe means of egress must be located in trench excavations 4 feet or more in depth so as to require no more than 25 feet of lateral travel.
1926.651(j)(2) Employees must be protected from excavated or other materials/equipment that could fall or roll into excavations by placing spoils at least 2 feet from the edge.
1926.651(k)(1) Daily inspections of excavations, adjacent areas, and protective systems must be made by a competent person prior to start of work, as needed during shift, and after every rainstorm.

Templates & JHAs covering 29 CFR 1926.651

Draft a Cited JHA Free