Paperwork for 29 CFR 1926.251: Rigging equipment for material handling.
Plain-English summary (not the official rule): Requires rigging equipment (slings, shackles, hooks) to be inspected prior to use on each shift and as necessary during use, and defective equipment removed from service immediately.
Competent person check: Rigging equipment must be inspected prior to use on each shift (1926.251(a)(1)) and by a competent person periodically.
Written records & field paperwork
| Citation | Document / Record | What to include |
|---|---|---|
| 29 CFR 1926.251(a)(1) | Pre-shift rigging inspection log | Log pre-shift inspection of alloy chains, wire rope, synthetic web slings, and shackles; document removal of any damaged gear. |
| 29 CFR 1926.251(a)(4) | Custom lifting accessory proof-test marking | Special custom-design grabs, hooks, clamps must be marked with safe working loads and proof-tested to 125% rated load. |
Key paragraphs referenced
| Paragraph | Summary |
|---|---|
| 1926.251(a)(1) | Rigging equipment must be inspected prior to use on each shift and as necessary during use; defective rigging removed immediately. |
| 1926.251(a)(2) | Employers must ensure rigging equipment has permanently affixed durable identification markings stating safe working loads and is not loaded in excess of rated capacity. |
| 1926.251(c) | Wire rope sling safe working loads, eye splices, and removal criteria. |
| 1926.251(e) | Synthetic webbing sling markings, capacity, and removal criteria for cuts, burns, or broken stitching. |