Concrete Daily Report & Pour Log
Miller Medical Annex · 4200 Lamar Blvd, Austin, TX
Batch Tickets, Slump, Air & Cylinders
| Ticket | Arrival | CY | Slump | Air % | Cylinders | Pour Area |
|---|---|---|---|---|---|---|
| #48102 | 7:45 AM | 9.0 | 4.5" | 5.2% | #1A–1D | East Footings |
| #48109 | 8:20 AM | 9.0 | 4.0" | 5.0% | #2A–2D | East Footings |
Crew, Curing & Delays
Crew: 6 Hill Country Concrete · 2 Sparks Electric
Curing: Wet burlap + 6-mil poly placed at 1:15 PM
Delays: Pump truck 40 min late; rain stop 1:40–2:15 PM
Curing: Wet burlap + 6-mil poly placed at 1:15 PM
Delays: Pump truck 40 min late; rain stop 1:40–2:15 PM
Pre-pour check: Rebar caps verified (29 CFR 1926.701(b))Superintendent: M. Alvarez
What’s in the download
- Editable Word (.docx), Excel (.xlsx), and printable PDF files
- Concrete Mix Design & Supplier
- Truck Ticket #, CY Poured, Slump & Air %
- Test Cylinder IDs & Lab Tech
- Curing Method & Blankets/Heaters
- Separate National Weather Service station block and site-observed delay lines
Get all 25 editable templates — Field Pack ($49 once)
Includes daily reports, concrete & roofing logs, 12 OSHA 1926 JHAs, T&M ticket, change orders, and inspection sheets. 14-day refund · Sold by Freeman Labs LLC.
Or
Note: Cold/hot weather concrete placement tolerances are governed by your project specs and ACI 306/305. Verify rebar impalement caps (29 CFR 1926.701(b)) before pour starts. See general GC Daily Report →