Concrete Pour & Formwork JHA Template (OSHA 1926 Subpart Q)
JHA for footing, slab, and wall pours covering protruding rebar impalement caps, concrete pump pipe supports and hose whip checks, wet-cement alkali burn PPE, and trowel deadman switches.
Includes Word (.docx), Excel (.xlsx), and PDF · Need just this JHA?
Draft for competent-person review: Walk the jobsite, adjust controls for actual conditions, and sign before work starts. Covers US federal 29 CFR Part 1926 only (state-plan states like CA, WA, and OR enforce extra rules). Not an OSHA compliance guarantee.
Steps, hazards & controls
| Work Step | Hazard | Control | 29 CFR 1926 Reference |
|---|---|---|---|
| Inspect formwork, rebar, and pump truck setup | Rebar impalement or high-pressure concrete hose whip | Cap or guard all protruding reinforcing steel onto or into which workers could fall to eliminate impalement Control level: engineering | |
| Inspect formwork, rebar, and pump truck setup | Rebar impalement or high-pressure concrete hose whip | Verify pump discharge pipe supports (100% overload design) and positive fail-safe coupling pins before priming pump Control level: engineering | |
| Place, vibrate, and finish wet concrete | Chemical/alkali eye and skin burns from wet cement splash; struck by suspended bucket or runaway power trowel | Wear ANSI Z87.1 splash-rated safety glasses/goggles, waterproof boots, and alkali-resistant gloves; stage eyewash station on site Control level: ppe | |
| Place, vibrate, and finish wet concrete | Chemical/alkali eye and skin burns from wet cement splash; struck by suspended bucket or runaway power trowel | Keep all crew out from underneath suspended concrete buckets during crane lifts Control level: administrative | |
| Place, vibrate, and finish wet concrete | Chemical/alkali eye and skin burns from wet cement splash; struck by suspended bucket or runaway power trowel | Verify manually guided power trowels have functioning deadman shutoff switches Control level: engineering |
Competent person & paperwork
Competent person required: Yes
Qualified/competent verification required before placing construction loads on cured concrete (1926.701(a)) and for formwork/shoring inspection.
- Pre-pour formwork/rebar check on Concrete Daily Report