Paperwork for 29 CFR 1926.702: Requirements for equipment and tools.
Plain-English summary (not the official rule): Covers concrete pumping systems (positive fail-safe pipe supports and coupling pins), powered trowels (deadman switch), concrete buckets (no riding, stay clear of suspended buckets), and lockout/tagout during mixer maintenance.
Written records & field paperwork
| Citation | Document / Record | What to include |
|---|---|---|
| 29 CFR 1926.702(e) | Pre-pour pump setup & hose whip-check verification | Verify pump outrigger cribbing, discharge pipe supports, and coupling safety pins before pour starts. |
Key paragraphs referenced
| Paragraph | Summary |
|---|---|
| 1926.702(c) | Powered and rotating type concrete troweling machines manually guided must have a control switch that automatically shuts off power when operator hands are removed. |
| 1926.702(e)(1) | Concrete pumping systems using discharge pipes must have pipe supports designed for 100% overload; compressed air hoses must have positive fail-safe joint connectors. |
| 1926.702(f)(2) | No employee shall be permitted to work under concrete buckets while buckets are being elevated or lowered into position. |