Paperwork for 29 CFR 1926.850: Preparatory operations.
Plain-English summary (not the official rule): Requires a written engineering survey by a competent person BEFORE demolition starts, shutting off/capping all electric, gas, water, steam, and sewer utilities, and shoring damaged walls/floors.
Competent person check: A competent person MUST complete a written engineering survey prior to starting demolition operations (1926.850(a)).
Written records & field paperwork
| Citation | Document / Record | What to include |
|---|---|---|
| 29 CFR 1926.850(a) | Written Pre-Demolition Engineering Survey | Employer must have in writing evidence that a competent person performed an engineering survey of framing, floors, walls, and adjacent structures before demolition begins. |
| 29 CFR 1926.850(c) | Utility shutoff / disconnect confirmation log | Document notification to utility companies and shutoff/capping of electric, gas, water, and sewer lines. |
Key paragraphs referenced
| Paragraph | Summary |
|---|---|
| 1926.850(a) | Prior to permitting employees to start demolition, an engineering survey must be made by a competent person and the employer must have in writing evidence that such survey has been performed. |
| 1926.850(c) | All electric, gas, water, steam, sewer, and other service lines must be shut off, capped, or otherwise controlled outside the building line before demolition work is started. |