Selective & Structural Demolition JHA Template (OSHA 1926 Subpart T)
Pre-demolition and tear-out JHA highlighting the mandatory written engineering survey by a competent person (1926.850(a)), utility shutoff/capping, floor-opening covers, and dust/eye PPE.
Includes Word (.docx), Excel (.xlsx), and PDF · Need just this JHA?
Draft for competent-person review: Walk the jobsite, adjust controls for actual conditions, and sign before work starts. Covers US federal 29 CFR Part 1926 only (state-plan states like CA, WA, and OR enforce extra rules). Not an OSHA compliance guarantee.
Steps, hazards & controls
| Work Step | Hazard | Control | 29 CFR 1926 Reference |
|---|---|---|---|
| Complete written engineering survey and disconnect utilities | Unplanned structural collapse, gas explosion, or energized line strike | Competent person completes and signs written engineering survey of framing, walls, and floors before work starts Control level: administrative | |
| Complete written engineering survey and disconnect utilities | Unplanned structural collapse, gas explosion, or energized line strike | Shut off, cap, or positively control all electric, gas, water, steam, and sewer services outside the demolition zone Control level: elimination | |
| Perform tear-out and protect exposed edges/floor openings | Falls through floor openings or flying debris eye/face injuries | Protect unprotected edges >= 6 ft and secure/mark covers (2x load) over all floor openings created during demo Control level: engineering | |
| Perform tear-out and protect exposed edges/floor openings | Falls through floor openings or flying debris eye/face injuries | Require ANSI Z87.1 impact eyewear with side shields (and face shield when prying/hammering overhead) Control level: ppe |
Competent person & paperwork
Competent person required: Yes
Employer MUST have written evidence of an engineering survey by a competent person before permitting employees to start demolition (1926.850(a)).
- Written Pre-Demolition Engineering Survey (29 CFR 1926.850(a))
- Utility Shutoff Confirmation Log (29 CFR 1926.850(c))